HP Industrial 3D Printing – Robotics and End of arm tooling (EOAT)

From molds to final and spare parts, produce quality 3D printed parts with optimal mechanical properties without the long lead times. See how HP 3D Printing with HP Multi Jet Fusion helps these companies reinvent the design and manufacturing…

22VPP/31VPP Selectable Output Piezo Sounder Driver from Diodes Incorporated Drives Higher SPL and Longer Runtimes

smartbuildingmag.com 11 {{ "2021-08-11T00:00:00+00:00" | date "MMM" }} '21 Written on {{ "2021-08-11T00:00:00+00:00" | date "longDate" }} Modified on {{ "2021-08-11T00:00:00+00:00" | date "longDate"…

Orbital Solar Services Wins 130 MW Contract

Another solar farm Orbital Solar Services is working on in Murfreesboro, N.C. Orbital Energy Group Inc.’s Orbital Solar Services (OSS) subsidiary has been awarded an engineering, procurement…

Social Warming, book review: Temperature rising, regulation required

Social Warming: The Dangerous and Polarising Effects of Social Media • By Charles Arthur • Oneworld • 352 pages • ISBN: 978-1-78607-997-8…

Solar Sales and Design Software Company Acquires Folsom Labs

HelioScope's advanced solar design software Aurora Solar has bought Folsom Labs, the developer of the HelioScope software solution…

IT upgrades and digitalisation fuels Lenovo’s Q1 119% net income growth

Lenovo has delivered more than double its net income for the first quarter of 2022 financial year as opportunities created by digitalisation and IT…

ArtiMinds and ATI Accelerate Technology Implementation with Greene Tweed

Choosing the right automation partners led Greene Tweed to quickly develop, integrate and install a more flexible automated material removal cell. Source link

AUTOMATION SYSTEM DDC4000 MEETS HIGHEST BACNET STANDARDS

smartbuildingmag.com 10 {{ "2021-08-10T00:00:00+00:00" | date "MMM" }} '21 Written on {{ "2021-08-10T00:00:00+00:00" | date "longDate" }} Modified on {{ "2021-08-10T00:00:00+00:00" | date "longDate"…

Orsted, Microsoft Sign PPA for 430 MW Texas Project

Microsoft Corp. is purchasing energy from Ørsted’s Old 300 Solar Center in Fort Bend County, Texas. The 430 MW AC solar energy…